In 2008, Inertia Consulting identified that the 70m Wilford Suspension Bridge in Nottingham had deteriorated significantly from previous inspections and its load-bearing capacity had become substandard. We were therefore appointed by Severn Trent Water plc to carry out a principal inspection, dimensional survey, capacity assessment, refurbishment scheme design – including temporary works – and construction supervision for the bridge.