Erpingham AGI (G35 Appraisal)

Providing design, structural assessment, G17, G35 and P55 approval and appraisal services, and specialist structural inspections, to the energy industry

The challenge

Erpingham Above Ground Installation (AGI) is another of the Feeder 2 block valve sites which form a key part of the UK Gas National Transmission System (NTS), which transfers gas from Bacton Gas Terminal. As part of their ‘National AGI Renovation Campaign’, which commenced in January 2018, National Grid decided to replace some of the older gas assets on Erpingham AGI as they were reaching the end of their working life.

Energy

Appraisal works

Inertia Consulting Ltd was appointed to appraise the civil and structural works relating to the replacement of the old block valves and corresponding gas infrastructure, security fencing, road layout and drainage systems. Our G35 Appraisal was undertaken in line with the latest Gas Standards and National Grid Specifications.

The project team
  • National Grid Gas plc – Client
  • Murphy & Sons Limited – Main Contractor
  • Premtech Ltd – Designer & G35 Approver
  • Inertia Consulting Ltd – G35 Appraiser